POWER GAS TURBINE

Deskripsi

Production continuity is a keyword in any process production activities, and power system play important role to keep all of the operation.

Gas turbine is known for its high power and high efficiency power generator with low volume engine. Its high energy, high speed rotation, etc., will become advantage if it’s operated and maintained properly. Gas turbine principle and performance however should be understood by operator and any person who get involved with them to increase performance of the operation, maintenance, safety, etc.

Tujuan

In this training, gas turbine generator will be discussed from principle, application, components and its maintenance. Moreover, failure phenomena such as surge, stall, stonewall and their control system to improve safety will also be introduced.

After completion of this training participant will understand about the basic principle, application and control system that will help them for improving safety and problem solving on operation and maintenance activities.

Materi Training

  • 1. Engineering Design
  • 2. Basics Operating Principles

Implementation and selection
Energy conversion
Engine Case – Air Inlet
Compressor Section
Diffuser & Combustion
Turbine & Exhaust

3. Turbine Components

4. Bearings & Seals

5. Lubrication & Lube Oil

  • Lube Oil Filters & Coolers
  • Lube Oil Instrumentation
  • Surging, stall, and stonewall
  • Generator Control

6. Fuel Systems

7. Starting System

8. Turbine control system

9. Principles of Power Generator

10. Generator Components

Peserta

The training can be important for all personnel involved with the design, installation, maintenance, operation and servicing of gas turbine generator and their basic systems.

Metode

Presentasi, Diskusi , Studi Kasus,

Investasi dan Fasilitas

  •  Rp. 5.900.000 per Peserta (Non residential)
  •  Fasilitas : Certificate,Training kits, USB,Lunch,Coffe Break, Souvenir
  •  Untuk peserta luar kota disediakan transportasi antar-jemput dari Bandara/Stasiun ke Hotel (khusus bagi perusahaan yang mengirimkan minimal 3 orang peserta)

 

Instruktur

Ir. Paryana Puspaputra, M.Eng. and Team

Formulir Permintaaan Informasi Lanjutan / Pra-Pendaftaran Public Training
    INFORMATION OPTIONS
    1. (required)
    2. (required)
    PERSONAL DATA
    1. (required)
    2. (required)
    3. (required)
    4. (valid email required)
    5. (required)
    6. (required)
    PRE REGISTRATION DATA (Tidak Mengikat)
    1. (required)
    MESSAGE FOR TRAINING PROVIDER
     

    4 thoughts on “POWER GAS TURBINE

    Leave a Reply

    Your email address will not be published. Required fields are marked *